New Major Project

CME - New Office Accommodation building

Project: CME - New Office Accommodation Building
School/Division: School of Biomedical Science and School of Animal & Vet Sciences
Location: Wagga Wagga
Timeline: April 2014
Project cost: $7.0M
Building area: 1,500 m2 (approx)
Project Status: Current
Project contact: Garry Crichton

3D Achitectural Drawing 3D Achitectural Drawing

Project Brief

2-storey building, mixed open plan/enclosed office space/social space.

Approx 80 staff, accommodation for the School of Biomedical Sciences and the School of Animal & Vet Sciences.

Architectural Features

The building will be of a modern design to complement the recently completed National Life Sciences Hub (NaLSH) building to the north. The building will link into the NaLSH building at ground level via a new entry/access area.

The ground floor will include amenities for staff and students such as lounge areas, kitchenettes, breakout learning areas, offices and meeting rooms. The first floor will be dominated by office space with two meeting rooms.

The building is a modern design, with a materiality of brick, glass and steel.

Building Floor Plans

Landscape Design 

Site establishment and traffic management plan - 15Jul13

Sustainability Features

4 star equivalent green star rating (ESD principles) have been incorporated into the design

The design has incorporated a number of initiatives to improve the energy efficiency of the building, including low wattage lighting/daylight dimming/occupancy sensors, high performance glazing, automatic switch off of air conditioning units in unoccupied areas and capture & harvesting of rainwater & low flow water fixtures.

Other features

Provision for future roof mount Photovoltaic solar cells. 

Consultants

Woods Bagot - Architects
Murchie Consulting - Services Engineers 
Meinhardt - Structural Engineers

CSU Project Officer: Michael Dunn (Thinc Projects) and Garry Crichton (DFM Project Officer)

Nexus to University Strategy 2011-2015

Consolidate and align selected divisions from Faculty of Science to the new Science precinct on Agriculture Campus. Ensure new office accommodation aligns with University strategy for sustainability, energy reduction, staff well being.

Disconnected schools/divisions consolidated to individual single locations where possible. Develop accommodation that provides flexibility for organisational change and growth.