Charles Sturt University
Charles Sturt University

Wagga Wagga Building 30 Student Kitchen

Project Snapshot

  • Location: Wagga Wagga
  • Cost: $30,000
  • Estimated Completion date:
    September 2017
  • Contact: Garry Crichton
  • Interruptions

    Minimal disruption is expected with all noisy works to be done outside of class times.

WW Building 30 Kitchenette

Scope

The new Kitchenette will allow students to prepare basic food & drinks during short breaks where there is insufficient time to access the main Campus food & drink services.

Design Features

The project will provide two new kitchenettes to the existing alcove spaces 288 & 290 on level 2 of Building 30. To view the sketch design SK-01 and scope of works can be downloaded for reference.

The kitchenettes will feature:

  • Built-in fridge,
  • microwave
  • boiling & chilled water on tap
  • fully laminated kitchen cupboards & splash-back

Sustainability Features

Energy efficient microwave, fridge and boiling & chilled water unit.