Charles Sturt University
Charles Sturt University

Wagga Wagga Building 481 Kitchen Upgrade

Project Snapshot

  • Location: Wagga Wagga
  • Cost: $34,000
  • Estimated Completion date:
    July 2017
  • Contact: Brendon Post
 481 Kitchen Refurbishment

Scope

Complete refurbishment of the kitchen in Building 481, inclusive of appliances.

Design Features

  • Installation of boiling/chilling water unit
  • Modern finishes
  • Increased cupboard space
  • Incorporate DIT cupboard for streamline finish

The proposed plan can be downloaded for further information.

Sustainability Features

  • Boiling/chilling water unit
  • LED light fittings installed
  • 3.5 Star energy rated fridge
  • 4.5 Star Water rating dishwasher
  • Block out blind installed to window

Additional Information

The Division of Facilities Management were able to utilise Charles Sturt University Campus Services (CSCS) for the construction clean at the completion of the refurbishment.

Progress report

Works are complete and the project is the defect liability stage.