Completed Minor Projects
HVAC
| Project: | HVAC (Heating, Ventilation & Air Conditioning) Upgrade - Stage 1 ILC Building |
|---|---|
| Location: | Dubbo Campus |
| Time line: | July 2009 |
| Project cost: | $1.2M |
| Project Status: | Completed |
| Project contact: | Victor Oyelade |
Project Brief
Stage 1 Interactive learning centre at Charles Sturt University was constructed in 2000, utilising passive air / water cooled chimneys in the central core of the building, but this system has not been able to provide the required thermal comfort for the building users and therefore require the addition of a supplementary cooling and heating system.
The project involves the supply, installation and commissioning of reverse cycle air conditioning system to serve the general areas, offices and rooms within the stage 1ILC building at the CSU Dubbo campus. These air conditioning systems shall replace the existing shower towers within the building. The existing evaporative coolers and shower towers are to be decommissioned and associated services isolated.
Consultants
Architect: John Blackwood Architect P/L Orange NSW
Mechanical Engineer: Connell Wagner Pty Ltd Adelaide
Project Managers: Xact Project Consultant Canberra