Charles Sturt University
Charles Sturt University

SSAF: Wagga Wagga Walking Loop

Project Snapshot

  • Location: Wagga Wagga
  • Client: SSAF
  • Cost: $267,000
  • Estimated Completion date:
    October 2019
  • Contact: Anh Nguyen
  • Category: Student Experience
SSAF Wagga Walking Loop Image

Scope

Students and staff have sought endorsement through SSAF for a good quality walking loop around the campus.

This link provides a 4km loop, which is approximately a 45 minute walk, inclusive of distance and directional signage.

The path will connect the two campus sporting precincts and provide a variety of gradients to promote fitness.

Design Features

  • New concrete pathways , 2.5m wide
  • New bitumen pathway, 2.5m wide
  • New signage.

Sustainability Features

  • Low maintenance design principles utilised
  • Waste management during construction
  • Waste collection co-mingle
  • Low VOC finishes powder coated.

Progress report

  • Gate 1 Complete
  • Gate 2 Return Brief by Dec 2018
  • Gate 4 Tender: Dec 2018
  • Award Contract: Jan 2018
  • Gate 5 Construction Completion by Apr 2019.